Home / Research installations / PV installation with vertical modules, arable land and flowering strips

PV installation with vertical modules, arable land and flowering strips

In operation

Key figures

Capacity
0 kWp
Area
0.33 ha
Module type
Bifacial vertical
Modules
144
Row spacing
12 m
Cultivation
Cereals
Commissioning
10/2023

What we are trialling at this installation

The vertical module arrangement is a deliberate choice: the modules stand upright in rows running east to west. Direct light therefore reaches the module surfaces in the morning and late afternoon, while generation is lower around midday — a load profile that matches typical demand and supports grid stability.

Winter cereals are grown between the module rows. The row spacing allows standard agricultural machinery to pass. Perennial flowering strips run along both sides of the module rows, serving as a buffer zone, habitat and source of pollinating insects.

The installation has been scientifically monitored since 2024. We record module yields, microclimate (wind, soil moisture, temperature), agricultural yields and the development of biodiversity in the flowering strips.

Our research questions

  • How does the vertical arrangement affect module yield across the year?
  • What effect does shading have on the microclimate between the rows?
  • How does insect diversity in the flowering strips change over several growing seasons?
  • What yields do winter cereals achieve under the altered light conditions?

Construction diary

  • March 2023

    Site preparation and foundations

    Driven foundations set for 4 module rows across 0.33 hectares. The existing crop rotation (winter barley) was respected.

  • April 2023

    Module mounting and cabling

    Bifacial modules mounted, DC cabling laid. Alongside this: sowing of the flowering strip at the foot of the modules.

  • June 2023

    Grid connection and commissioning

    Inverters and transfer station in operation. First electricity delivered to the public grid.

  • September 2023

    Sensors fully installed

    Weather station, 24 soil moisture probes and microclimate measuring points active.

  • Summer 2025

    First full growing season

    Cereal and soy strips harvested. Flowering strip monitoring completed. Preliminary evaluation May 2026.

First results

  • 20 % Soil water loss on hot days
  • 20 % Soil water loss on hot days
  • 20 % Soil water loss on hot days
  • 20 % Soil water loss on hot days

Who is building this installation with us

  • Next2Sun AG

    Module manufacturer, technical design of the bifacial installation.

  • Heide Solar GmbH & Co. KG

    Project development and construction.

  • Buß Regenerative Projekte GmbH

    Planning and maintenance of the photovoltaic technology.